ISOCLIP in Modena
Project: Construction and installation of insulation coat of a 3-story private building
Location: Modena
Year: Beginning of work 2023
Products: EPS panel and porcelain stoneware
How ISOCLIP® is made
Equipped with an insulating panel (in Aerogel or Glass Wool or EPS with graphite), ISOCLIP® is internally constituted by a powerful insulating stratigraphy. The adhesive layer in contact with the ceramic slab and the stainless steel hooks facilitate the installation of a porcelain stoneware slab for a quality, resistant and long-lasting aesthetic result.
ISOCLIP® arrives on site already pre-assembled and ready for installation. It is mounted directly on the external walls of the building, without resorting to invasive work or demolition, with installation times reduced by 50% compared to a traditional coat.
Installation
The correct direction for the installation of ISOCLIP® panels is from the bottom, starting from the right and proceeding leftwards.
The ideal team of operators consists of 3 to 4 people who can lay between 70 and 90 square meters per day.
Glue application can take place at temperatures between 5° and 35°C.
ISOCLIP® can be laid on different types of wall.
Comply with the following steps:
– Checking the coplanarity of the substrate; in case of unevenness, a skim coat can be used;
– Check the type of dowel to be installed, the system weighs max 20kg/sqm;
– Cleaning of the surface and/or application of a primer (not mandatory);
– Laying of the starter profile and verification of alignments;
– Laying of glue with a notched trowel with parallel rifling to the short side on both support and Isoclip® panel with C2TES2 glue;
– Fixing with dowels (No. 4 per panel);
– Adjustment of panel flatness and joints (4-5 mm);
– Polyurethane grouting and the creation of expansion joints every 12 sq. m. at max;
(Can be performed as early as 24 h after the panel installation)